Project: Arrangement of the storm water system of Imavere Sawmill
Contracting entity: Stora Enso Eesti AS
The objective of this undertaking was to prepare the working project for storm water drainage in the territory of Imavere Sawmill (belonging to Stora Enso Eesti AS) in Imavere Rural Municipality. The territory was designed with the direction from southwest to northeast, and with an asphalt pavement. According to the project, ditches next to the squares of the design area were cleaned of sediments and shrub. The design project also included a storm water collector and grated inlets. For the treatment of storm water, the project included an oil trap together with a sand and sludge trap.