Project: Design of heat pipelines in Võhma
Contracting entity: Võhma ELKO AS
This project was used to reconstruct a part of the outdated distribution system of the city of Võhma, and the connection pipelines of approximately five consumers. In addition to the project solution for the heat network, we had to find solutions for new power and communication cables. The length of the reconstructed pipeline was about 730m, of which approximately 35m involved the closed method.