Project: Design of the heat pipelines of the streets of Rakvere
Contracting entity: AS Rakvere Soojus
We prepared the working project for pipelines and a temporary traffic management project, which provided a solution for the reconstruction of the outdated heat network in different areas of Rakvere. The length of the new pre-insulated network was approximately 1,200m, and the work also covered the reconstruction of approximately ten consumers’ connections to the existing network.